Can company data that is already in the Customer ID (PLG ID) system be changed if there are changes in the data?
To change data on the Customer ID (PLG ID) is the authority of the Directorate of Standardization, the applicant comes directly to the SDPPI service counter.
What are the requirements for obtaining a certificate of need for test samples?
The procedure for obtaining a certificate of need for test samples is the same as the procedure for requesting testing plus attaching a Letter of Request for Need for Test Samples
How many test samples are needed when testing telecommunications equipment at the Telecommunications Equipment Testing Center?
The number of devices required is 1 (one) or more, at the request of BBPPT and accompanied by a photo of the device
How long does the process take to get a Test Results Report (LHU) after a notification has been issued that testing has been completed?
The LHU can be downloaded at SIMPEL via the applicant's account after notification that testing has been completed.
How much do consumers charge for testing telecommunications equipment? Can consumers download the test rates or access them via what website?
Testing rates depend on the features of a telecommunications device. The tariff reference has been regulated in Government Regulation Number 80 of 2015 concerning Non-Tax State Revenue within the Ministry of Communication and Information. The cost simulation can be seen on the website http://bbppt.postel.go.id/ jasa/tarif_uji
Why the LHU file cannot be verified by the Directorate of Standardization.
LHU downloaded via SIMPEL must not be compressed or edited because it will remove the digital signature on the LHU.
When verifying function, what equipment does the test applicant need to prepare?
When verifying the function, the applicant is required to bring a test sample as uploaded by the applicant at the beginning of the application and other necessary equipment or support.
What telecommunications equipment can receive EMC testing at the Telecommunications Equipment Testing Center, considering that EMC testing is currently required as one of the mandatory requirements for obtaining a telecommunications equipment certificate?
Currently, the Telecommunication Equipment Testing Center can only carry out conducted emission testing.
I want to test telecommunications equipment, but my test sample is detained at Customs. What requirements are needed to obtain a certificate of need for a test sample so that the detained sample can be released from Customs and taken to the Test Center?
Please contact the Directorate of Standardization to obtain a Letter of Recommendation.
Is the account used to submit a test request on the Telecommunications Equipment Test Management Information System (SIMPEL) the same as the test account on SIP2TEL?
The current information system for testing services is SIMPEL, replacing the old information system, namely SIP2TEL, so that accounts on SIP2TEL are no longer valid.
Currently, the Telecommunications Equipment Testing Center is still accepting applications for Class I and Class II testing. If you still receive the application, how much will be charged and how long will it take
The Telecommunications Equipment Testing Center can accept Class I and Class II tests by considering laboratory capacity. Rates and times are in accordance with Article 12 of Government Regulation Number 80 of 2015 concerning Non-Tax State Revenue within the Ministry of Communication and Information.
What is meant by test mode?
Test Mode refers to a specific operational state or configuration in which a system or device is used for testing purposes rather than normal operation. It enables developers, engineers, users, or testers to evaluate and verify the functionality, performance, or compatibility of a product or device. Test Mode is usually software that forces the device to transmit on a certain frequency.
What is the flow of telecommunications equipment testing without function verification?
1. Applicants submit documents first on the website bpppt.postel.go.id/pengujian 2. Submitted documents will undergo Document Verification and Technical Document Verification 3. Issuance of SP2, Applicants pay the testing fee as stated in SP2. 4. Applicants bring the device according to schedule and will be tested for a period of 10 HK or 7 HK (Electrical Safety features) work. 5. The applicant receives notification that the test is complete on the email registered in the application and the status becomes "Sample Returned", the LHU can be downloaded directly by the applicant on the SIMPEL website and the device can be returned to the applicant.
What features are included in the telecommunications device testing flow without function verification
In accordance with the Implementation Guidelines for the Head of the Telecommunication Equipment Testing Center Number 621 of 2022, there are 20 features included in the flow of testing telecommunications equipment without function verification as follows: 1. bluetooth; 2. analog to digital converter (Analog or Digital Broadcast TV); 3. audio distribution amplifier (Analog or Digital Broadcast TV); 4. encoder (Analog or Digital Broadcast TV); 5. IPTV encoder; 6. integrated IPTV decoder receiver; 7. IP set top box (IP-STB); 8. modulator (Analog or Digital Broadcast TV); 9. multiplexer (Analog or Digital Broadcast TV); 10. cable set top box; 11. satellite receiver set top box; 12. terrestrial receiver set top box; 13. Cable TV modulator; 14. video distribution amplifier; 15. video telephone/video conference; 16. wireless LAN; 17. electrical safety; 18. two-way radio with maximum transmit power of 5W; 19. short range devices with transmit power below 10mW; and/or 20. IP Phone
What is the flow of telecommunications equipment testing with function verification?
1. Applicants submit documents first on the website bpppt.postel.go.id/pengujian 2. Submitted documents will undergo Document Verification and Technical Document Verification 3. Applicants will be given Function Verification Scheduling and carry out Function Verification by bringing the device. 4. Issuance of SP2, Applicants pay the testing fee as stated in SP2. 5. Testing will be carried out on 17 work HKs after SP2 payment has been made. 6. The applicant receives notification of completion of testing on the email registered in the application and the status becomes "Sample Returned", the LHU can be downloaded directly by the applicant on the SIMPEL website and the device can be returned to the applicant.
How to pay SP2
SP2 payments can be made via Teller and M-Banking on a host to host basis through Bank Mandiri, BNI and BSI. Teller: please bring the SP2 attachment obtained from the system to show to the Bank Teller. M-Banking (Mandiri): 1. please log in to the Livin Mandiri application 2. select the "Pay" menu 3. select the "Other" menu, then type "Directorate General of SDPPI" 4. enter the Invoice ID number/Bill Number (Host to Host) , Client ID and Payment Type as stated in the SP2 attachment, click "Continue" 5. After clicking "Continue", device details and fees will be displayed according to the nominal value in SP2. If it is correct, click "Pay" 6. Save the receipt as proof of your payment
How do I get a Test Results Report (LHU) that has been issued to be used as an extension for a telecommunications equipment certificate?
For certification applications that still use the Equipment Testing Cover Letter (SP3), the application to obtain LHU is submitted to the Directorate of Standardization. For test requests that use the Device Test Request Form (FP3), LHU is sent via email. Since March 2019, LHU can be downloaded directly via the applicant's account on SIMPEL.
How long does it take to test telecommunications equipment?
Testing of telecommunications equipment through function verification is carried out no later than 17 Working Days starting from the SP2 issued by BBPPT paid by the device testing applicant. Meanwhile, testing of telecommunications equipment without function verification is carried out within a maximum of 10 working days from the time of testing scheduling and specifically for electrical safety, it is 7 working days.
One of the testing requirements is the existence of testing instructions or test instructions. How do I get testing instructions or testing instructions? Is there a standard format?
The test instructions format is submitted to each manufacturer which contains how to operate telecommunications equipment based on the features it has so that the device is ready to be tested.
What requirements does the applicant need to prepare to take test samples that have been tested? And since when can applicants take test samples that have completed testing?
Requirements for taking test samples: 1. KTP (Original) 2. Minutes of Sample Handover (Original) Applicants can take test samples after notification that testing has been completed.
Who is the authorized party to fill in the technical declaration?
The party who has the authority to fill out the Technical Declaration is the telecommunications equipment manufacturer or the applicant who obtains technical information from the telecommunications equipment manufacturer.
What are the Requirements for Submitting an Application for Testing Telecommunication Equipment?
1. The applicant must have a PLG ID which can be obtained at the SDPPI integrated service counter and the NIB can be obtained at the OSS Task Force. 2. After having the NIB and PLG ID, the applicant logs in on the bpppt.postel.go.id/pengujian page using the same account as the account in e-certification. 3. The applicant uploads the following document requirements: a. Technical Specifications (in the form of brochures or data sheets) b. Manual Book c. Testing Instructions/Instructions d. Device Photo e. Technical Declaration For a more complete explanation regarding document requirements, please see https://bbppt.postel.go.id/information/documents